Repair and reinforcement of the foundations and structure of the GABES hospital buildings
- Amount of work : 5 680 880.514 TND
- Work completion time : 900 day
- Master of work : Ministry of Equipment and Housing
Consistency of the work
Repair and reinforcement work on the foundations and structure of the buildings of the GABES regional hospital:
- Removal of doors and windows.
- Demolition of covering, screed and wall.
- Concrete ground structures.
- Interior brick walls.
- Interior and exterior wall coatings.
- Tile coverings.
- Rainwater pipe.
- Supply, installation and sealing of wood or aluminum joinery works.
- Supply and installation of windows.
- Painting of walls, ceilings, carpentry and ironwork.
- Repair of concrete structures in elevation.