Construction work on a crossing of the EL BATTEN wadi on the RR82 at PK112 in the governorate of NABEUL

Construction work on a crossing of the EL BATTEN wadi on the RR82 at PK112 in the governorate of NABEUL

Project

Construction work on a crossing of the EL BATTEN wadi on the RR82 at PK112 in the governorate of NABEUL

  • Market amount : 4 123 635.017 TND
  • Work execution deadline: 20 months
  • Project owner: Ministry of Equipment and Housing
  • Progress of work: 21%

Consistency of the work

Roads part:

    • Development of the RR28 road over a length of 434.6m.

Part AO:

    • Two juxtaposed bridges with prefabricated RC girder decks.