Rades - Goulette Lot IV bridge north link road

Rades - Goulette Lot IV bridge north link road

Project

Rades Bridge / La Goulette Lot IV
Route de Liaison Nord Extension of the Voie Express CH.413

  • Contract amount: 11,149,304,981 TND
  • Work execution time: 24 months
  • Client: Ministry of Housing Equipment and Land Use Planning

Consistency of the work

The work carried out in this project includes the construction of:

  • North Extension Route (Extension of the Express Route), over a length of 6,000 km.
  • 1 Bridge over Khair-eddine Canal.
  • 1 STEG canal bridge
  • 1 Crossroads
  • Drainage works (reinforced concrete channel, single and multiple scuppers)
  • Bridge over Khair-eddine Canal: Length of the bridge: 58 ml with 4 spans of 14.50 ml with 2 reinforced concrete decks, the work is based on driven piles of reinforced concrete 25 meters deep
  • STEG Canal Bridge: Length of the bridge: 14.5 ml with 2 reinforced concrete decks, the structure is based on driven piles in reinforced concrete 25 meters deep

The main quantities

  • Landfill or landfill: 6,000 m3
  • Loan for backfill: 185,000 m3
  • Gravel bitumen: 26,500 m3
  • Bituminous concrete: 7,500 m3
  • Concrete: 2,467 m3
  • Concrete reinforcement: 350,000 Kg