Project
Interconnection project of the EL HOUEREB and SIDI SAAD dams
- Market amount : 6 868 459.807 TND
- Work execution deadline: 26 months
- Project owner: General Directorate of Dams and Major Hydraulic Works
- Progress of work: 45%
Consistency of the work
Lot N°: 2-1:
- Transport and installation of pipes in concrete reinforcement and sheet metal core with a diameter of 1000 mm, GC of works on the pipe and assembly of equipment.
- Pipe transport: 26,000ml, earthworks: 378,000m3, concrete: 1,400m3, gabion: 3,000m3, carpentry and ironwork: 19,000kg, prefabricated structures: 51U.
Lot N°: 2-2:
- GC works of the pumping station, concrete: 710m3, steel: 40T and formwork: 2050m2.