Interconnection project of the EL HOUEREB and SIDI SAAD dams

Interconnection project of the EL HOUEREB and SIDI SAAD dams

Project

Interconnection project of the EL HOUEREB and SIDI SAAD dams

  • Market amount : 6 868 459.807 TND
  • Work execution deadline: 26 months
  • Project owner: General Directorate of Dams and Major Hydraulic Works
  • Progress of work: 45%

Consistency of the work

Lot N°: 2-1:

    • Transport and installation of pipes in concrete reinforcement and sheet metal core with a diameter of 1000 mm, GC of works on the pipe and assembly of equipment.
    • Pipe transport: 26,000ml, earthworks: 378,000m3, concrete: 1,400m3, gabion: 3,000m3, carpentry and ironwork: 19,000kg, prefabricated structures: 51U.

Lot N°: 2-2:

    • GC works of the pumping station, concrete: 710m3, steel: 40T and formwork: 2050m2.