Execution works of the reservoir dam in SAIDA-MANOUBA

Execution works of the reservoir dam in SAIDA-MANOUBA

Project

Execution works of the reservoir dam in
SAIDA-MANOUBA

  • Market amount : 137,944,842,011 TND
  • Work execution deadline: 48 months
  • Project owner: General Directorate of Dams and Major Hydraulic Works
  • Progress of work: 68%

Consistency of the work

Construction of a dam and its associated structures on wadi el MELAH, its reservoir with a total capacity of 45 million m3 over an area of 310 Ha.

  • The surface area of the BV is around 7.05km2.
  • The dike is of the zoned earth type, its maximum height on TN is 51m, its length at the crest is 1100m and its width at the crest is 8m
  • The volume of the dam body is of the order of 3,673,000m3
  • The volume of concrete work: 28,000m3, diaphragm wall: 750 ml.
  • Piles with a diameter of 800mm and a depth of 30ml: 81U.