Construction of the Tunis-Sbikha highway

Construction of the Tunis-Sbikha highway

Projet

Construction of the Tunis-Sbikha highway - Batch N°2:
Zaghouan-ElFahs CS.930

  • Amount of work : 126 538 395.581 TND
  • Work completion time : 36 month
  • Master of work : Ministry of Equipment and Housing
  • Progress works : 2 %

Consistency of the work

Works consists on execution of 7 km of highways and 17 km of dual carriageway :

  • The current section : from PK 26 to PK 33
  • Bridges : OA15 to OA15
  • Fahs road (Double way of RR28 road over 7.8 km and ring road of El Fahs over 8.9 km)
  • El Fahs North interchange
  • 26 hydraulic structures (4 current section and 25 El Fahs road) and 3 bridges over river in RC structure.