Construction of the Tunis-Sbikha highway - Batch N°2:
Zaghouan-ElFahs CS.930
- Amount of work : 126 538 395.581 TND
- Work completion time : 36 month
- Master of work : Ministry of Equipment and Housing
- Progress works : 2 %
Consistency of the work
Works consists on execution of 7 km of highways and 17 km of dual carriageway :
- The current section : from PK 26 to PK 33
- Bridges : OA15 to OA15
- Fahs road (Double way of RR28 road over 7.8 km and ring road of El Fahs over 8.9 km)
- El Fahs North interchange
- 26 hydraulic structures (4 current section and 25 El Fahs road) and 3 bridges over river in RC structure.