Works of 2x2 lanes of the RR27 road between NABEUL and the city of KORBA

Works of 2x2 lanes of the RR27 road between NABEUL and the city of KORBA

Project

Works of 2x2 lanes of the RR27 road between Nabeul (PK 27) and the town of KORBA (PK 46) - Section 1

  • Contract amount: 41 084 414,145 TND
  • Work execution time: 36 months
  • Client: D.G.P.G
  • Progress works : 59 %

Consistency of the work

Works of 2x2 lanes of the RR27 road between NABEUL (PK27) and the town of KORBA (PK46). Section 1: Clearance of rights-of-way, general earthworks, roadways, drainage, maintenance of existing structures, construction of an engineering structure on the Kebir wadi to double the existing structure: 4-span slab bridge of total length 56m, structure of art on wadi Dharoufa: two beam bridges with a single span of 16m, engineering structure on wadi Abidis: multicellular framework bridge with 8 4x3 cells, signaling & security works, and public lighting.