Project
Works of 2x2 lanes of the RR27 road between Nabeul (PK 27) and the town of KORBA (PK 46) - Section 1
- Contract amount: 41 084 414,145 TND
- Work execution time: 36 months
- Client: D.G.P.G
- Progress works : 59 %
Consistency of the work
Works of 2x2 lanes of the RR27 road between NABEUL (PK27) and the town of KORBA (PK46). Section 1: Clearance of rights-of-way, general earthworks, roadways, drainage, maintenance of existing structures, construction of an engineering structure on the Kebir wadi to double the existing structure: 4-span slab bridge of total length 56m, structure of art on wadi Dharoufa: two beam bridges with a single span of 16m, engineering structure on wadi Abidis: multicellular framework bridge with 8 4x3 cells, signaling & security works, and public lighting.