Construction works for the dikes at the mouth of the OUED HAMDOUN SOUSSE

Construction works for the dikes at the mouth of the OUED HAMDOUN SOUSSE

Project

Construction works for the dykes at the mouth of the OUED HAMDOUN SOUSSE

  • Contract amount: 4,232,768,874 TND
  • Work execution time: 10 months
  • Client: STEG

Consistency of the work 

Construction of a south dike at the mouth of the wadi Hamdoun, 235m long.
Extension of the existing dyke located north of the mouth of Wadi Hamdoun, 85m in length.
Dredging widening of the mouth of the wadi to the level of -2.0m NGT.