Project
Repairs to landslide points on classified roads and rural tracks in the governorate of Bizerte-Metline
- Contract amount: 6 757 745.103 TND
- Work execution time: 10 months
- Contracting authority: GENERAL DIRECTORATE OF BRIDGES AND ROADS
Consistency of the work
2 Landslide points:
Route MC 69 E1 from PK 15.8 to PK 16
Amount of PK 16 at the Metline PK 15.8 access restoration level