Project
Reinforcement work on the motorway section (A1 Tunis - Sfax motorway).
- Contract amount: 27 603 655.565 TND
- Work execution time: 8 months
- Client: Tunisie Autoroutes
Consistency of the work
The purpose of this contract is:
Milling: 1 cm, 6cm and 10 cm;
Basecoat in GB 0/20;
BB bearing layer;
Repair work located on the A3 and A4 motorways;
Renewal of the non-slip layer of toll barriers;
Replacement of defective pavement joints.