Project
Maghrebine Mahres - GHraiba Highway
- Contract amount: 82 369 037.049 TND
- Work execution time: 36 Months
- Contracting authority: TUNISIE AUTOROUTES
Consistency of the work
The purpose of this contract is:
- General terrassemnt.
- Road works.
- Hydraulic works and drainge.
- Placement of topsoil.
- Construction of engineering structures (overpasses, underpasses, retaining walls).
- Development of crossroads and interchanges.
- Signage and safety equipment.
- Infrastructure of toll stations.
- Earthworks of the rest areas and the National Guard post.