Putting the south penetrating into 2X4 lanes and decongestion of the south exit LOT N ° 5: Works of the RN3E1 - RN3 - Route X and RN3-YAHOUDIYA interchanges in the Governorate of BEN AROUS CH.522
- Contract amount: 50 688 261.869 TND
- Work execution time: 30 Months
- Client: Ministry of Equipment-DGPC
- Progress works : 14 %
Consistency of the work
- Road works and diversion of ONAS networks and SONEDE pipes as well as landscaping-public lighting and development in favor of the environment.
- OA works: 3 structures of prestressed concrete slab type each composed of (02) juxtaposed bridges of respective lengths 81.3m (18 + 2 * 22 + 18) -102.9m (18 + 3 * 22 + 18) -83.9 m (18 + 22 + 25 + 18). All the supports are based on Ø1000mm bored piles.