Project
Motorway interchange at ENFIDHA CH.455 Airport
- Contract amount: 13 907 036.613 TND
- Work completion time: 18 months
- Client: Ministry of Housing Equipment and Regional Planning
Consistency of the work
- 5.6 km of roads
- 3 Structural works in prestressed concrete on deep foundations (Ø 900 mm piles) including
- 1 Viaduct with 2 long apron 251 ml
- 1 long curved bridge 80 ml
- 1 long curved bridge 125 ml
The main quantities
- Landfill or landfill: 1,050 m3
- Loan for backfill: 225,850 m3
- Gravel bitumen: 7,900 m3
- Bituminous concrete: 3,250 m3
- Concrete: 7,750 m3
- Concrete reinforcement: 590,000 Kg
- Prestressing reinforcement: 120,000 Kg