Motorway interchange at ENFIDHA airport

Motorway interchange at ENFIDHA airport

Project

Motorway interchange at ENFIDHA CH.455 Airport

  • Contract amount: 13 907 036.613 TND
  • Work completion time: 18 months
  • Client: Ministry of Housing Equipment and Regional Planning

Consistency of the work

  • 5.6 km of roads
  • 3 Structural works in prestressed concrete on deep foundations (Ø 900 mm piles) including

                  - 1 Viaduct with 2 long apron 251 ml
                  - 1 long curved bridge 80 ml
                  - 1 long curved bridge 125 ml

The main quantities

  • Landfill or landfill: 1,050 m3
  • Loan for backfill: 225,850 m3
  • Gravel bitumen: 7,900 m3
  • Bituminous concrete: 3,250 m3
  • Concrete: 7,750 m3
  • Concrete reinforcement: 590,000 Kg
  • Prestressing reinforcement: 120,000 Kg