Reinforcement works of the GP15 road and of the GP3 road in the governorate of Gafsa

Reinforcement works of the GP15 road and of the GP3 road in the governorate of Gafsa

Reinforcement of the GP15 road from PK 114.7 to PK 131.5 and the GP3 road from PK 378.5 to PK 399.1 (L = 37.4 Km) in the governorate of Gafsa LOT 17

  • Contract amount: 6 876 246,700 TND
  • Work execution time: 7 months
  • Client: Ministry of Equipment (General Directorate of Bridges and Roads)

    Consistency of the work

    The work is summarized as follows:

    . Repairs located in degraded parts of the road;

    . Execution and implementation of a bonding layer on the old roadway;

    . Execution and implementation of the reinforcement of the asphalt concrete pavement 0/14;

    . Reloading and shoulder in all directions 0/40;

    . Execution of the connection works of the reinforced roadway with all the arteries which connect to it;

    . Execution of road marking works.