Reinforcement of the GP15 road from PK 114.7 to PK 131.5 and the GP3 road from PK 378.5 to PK 399.1 (L = 37.4 Km) in the governorate of Gafsa LOT 17
- Contract amount: 6 876 246,700 TND
- Work execution time: 7 months
- Client: Ministry of Equipment (General Directorate of Bridges and Roads)
Consistency of the work
The work is summarized as follows:
. Repairs located in degraded parts of the road;
. Execution and implementation of a bonding layer on the old roadway;
. Execution and implementation of the reinforcement of the asphalt concrete pavement 0/14;
. Reloading and shoulder in all directions 0/40;
. Execution of the connection works of the reinforced roadway with all the arteries which connect to it;
. Execution of road marking works.