Widening and strengthening of the MC59 road in the Governorate of Jendouba

Widening and strengthening of the MC59 road in the Governorate of Jendouba

Project

Widening and strengthening of Route MC 59 from KP 23.4 to KP 44.6
in the Governorate of Jendouba Lot n ° 2 CH.430

  • Contract amount: 6,785,797,302 TND
  • Work completion time: 18 months
  • Client: Ministry of Housing Equipment and Land Use Planning

Consistency of the work

This project includes all works to widen and strengthen the MC 59 road over a length of 21.1 km.

  • Earthworks
  • Pavement
  • Sanitation and drainage
  • 1 bridge structure with prefabricated beams, and with deep foundations (bored piles Ø 1000).
  • 26 hydraulic structures
  • Signaling and safety equipment

The main quantities

  • Landfill or landfill: 115,000 m3
  • Loan for backfill: 105,000 m3
  • Double-layer coating: 468,000 m2
  • Gabions: 3,000 m3
  • Piles Ø 1000: 12 units