Rehabilitation of the RN 7 road from PK 96.5 to PK 124

Rehabilitation of the RN 7 road from PK 96.5 to PK 124

Project

Rehabilitation of the RN 7 road From PK 96.5 to PK 124
in the Governorate of Bizerte Lot n ° 2 CH.412B

  • Contract amount: 8,085,410,000 TND
  • Work completion time: 18 months
  • Client: Ministry of Housing Equipment and Land Use Planning

Consistency of the work

This contract includes all the works necessary for the rehabilitation of the RN 7 road in the governorate of Bizerte over a length of 27.5 km, they include:

  • 70 Hydraulic works
  • Earthworks
  • Pavements
  • Development of crossroads
  • Crossings and drainage works
  • Signage and safety structures
  • Retaining walls

The main quantities

  • Landfill or landfill: 270,000 m3
  • Loan for backfill: 180,000 m3
  • Demolition of structures: 1,950 m3
  • Pavement body: 217,500 m3
  • 240,000 m2 cut bak impregnation
  • Double-layer coating: 235,000 m2
  • Bituminous concrete: 12,000 tonnes
  • Gabions: 8,000 m3