Rehabilitation of the RN 7 road from PK 65 to PK 96.5

Rehabilitation of the RN 7 road from PK 65 to PK 96.5

Project

Rehabilitation of the RN 7 road From PK 65 to PK 96.5
in the Governorate of Bizerte Lot n ° 1 CH.412

  • Contract amount: 7,510,060,000 TND
  • Work execution time: 22 months
  • Client: Ministry of Housing Equipment and Land Use Planning

Consistency of the work

This contract includes all the works necessary for the rehabilitation of the RN 7 road in the governorate of Bizerte over a length of 31.5 km, they include:

  • 68 Hydraulic works
  • Earthworks
  • Pavements
  • Crossings and drainage works
  • Development of crossroads
  • Signage and safety structures
  • Retaining walls

The main quantities

  • Landfill or landfill: 320,000 m3
  • Loan for backfill: 190,000 m3
  • Demolition of structures: 1,990 m3
  • Pavement body: 230,000 m3
  • Cut bak impregnation 270,000 m2
  • Double-layer coating: 260,000 m2
  • Bituminous concrete: 5,000 tonnes
  • Gabions: 6,000 m3