Doubling of the RN 1 road, southern section of Sousse
PK 140 to PK 158 CH.403

  • Contract amount: 13 677 008,243 TND
  • Work completion time: 18 months
  • Client: Ministry of Housing Equipment and Land Use Planning


Consistency of the work

Doubling of the RN 1 road on its section located south of Sousse over a length of 18,360 km, they include:

  • Earthworks
  • Pavements
  • Crossings and drainage works
  • Development of crossroads
  • Sanitation and drainage
  • Signage and safety structures
  • Hydraulic works
  • Public lighting

The main quantities

  • Landfill or landfill: 80,000 m3
  • Loan for backfill: 100,000 m3
  • Demolition: 21,570 m3
  • Pavement body: 141,000 m3
  • Cut bak impregnation 170,000 m2
  • Bituminous concrete: 50,000 tonnes
  • Concrete: 5,500 m3
  • Steels: 480,000 kg