EXCHANGER AIRPORT WAY X - RN 8

EXCHANGER AIRPORT WAY X - RN 8

Project

Airport interchange
Channel X - RN 8 CH.385

  • Contract amount: 9 354 414 451 TND
  • Work execution time: 30 months
  • Client: Ministry of Housing Equipment and Land Use Planning

Consistency of the work

It is a complete interchange consisting of 4 structures and 7.8 km of carriageways.

  • 1 reinforced concrete slab bridge with 8 spans and 2 long deck 85.77 ml
  • 1 reinforced concrete slab bridge with 7 spans, 79 ml long
  • 1 reinforced concrete slab bridge with 8 spans 102 ml long
  • 1 reinforced concrete frame bridge with 2 21 ml long decks
  • The structures are based on deep foundations (bored piles Ø 1000 mm sheathed drilling numbers of 135 piles)

The main quantities

  • Landfill or landfill: 55,000 m3
  • Loan for backfill: 110,200 m3
  • Grave bitumen: 26,400 tonnes
  • Bituminous concrete: 19,500 tonnes
  • Concrete: 10,300 m3
  • Concrete reinforcement: 991,000 Kg
  • Sleeves for pile drilling: 358,100 kg