Project
Development of place Bab Saadoun CH 351
- Contract amount: 10 112 745.850 TND
- Work execution time: 27 months
- Client: Ministry of Housing Equipment and Land Use Planning
Consistency of the work
Construction of 2 tunnels
- 1 bidirectional reinforced concrete tunnel with a total length of 292 ml and a width of 10 ml, of which 68 ml in a covered trench
- 1 unidirectional reinforced concrete tunnel with a total length of 297 ml and a width of 7.50 ml, including 100 ml in a covered slice
- 1 ONAS scupper with a total length of 440 ml
- Floor layout 47,800 m2 including 12,700 of sidewalks
- A geomembrane waterproofing is used for the protection of tunnels
The main quantities
- Landfill or landfill: 39,000 m3
- Loan for backfill: 12,000m3
- Grave bitumen: 8,600 tonnes
- Bituminous concrete: 2,000 tonnes
- Concrete: 10,300 m3
- Concrete reinforcement: 927,000 Kg
- Waterproofing by geomembrane: 16,360 m2