Development of the Bab Saadoun square

Development of the Bab Saadoun square

Project

Development of place Bab Saadoun CH 351

  • Contract amount: 10 112 745.850 TND
  • Work execution time: 27 months
  • Client: Ministry of Housing Equipment and Land Use Planning


Consistency of the work

Construction of 2 tunnels

  • 1 bidirectional reinforced concrete tunnel with a total length of 292 ml and a width of 10 ml, of which 68 ml in a covered trench
  • 1 unidirectional reinforced concrete tunnel with a total length of 297 ml and a width of 7.50 ml, including 100 ml in a covered slice
  • 1 ONAS scupper with a total length of 440 ml
  • Floor layout 47,800 m2 including 12,700 of sidewalks
  • A geomembrane waterproofing is used for the protection of tunnels

The main quantities

  • Landfill or landfill: 39,000 m3
  • Loan for backfill: 12,000m3
  • Grave bitumen: 8,600 tonnes
  • Bituminous concrete: 2,000 tonnes
  • Concrete: 10,300 m3
  • Concrete reinforcement: 927,000 Kg
  • Waterproofing by geomembrane: 16,360 m2