Protection of the fishing port of Bekalta

Protection of the fishing port of Bekalta

Project

Protection of the fishing port of Bekalta CH.450

  • Contract amount: 3,223,402,386 TND
  • Work completion time: 450 days
  • Client: Ministry of Agriculture and Water Resources General Directorate of Fisheries and Aquaculture


Consistency of the work

Protection of the fishing port of Békalta against the invasion of seaweed, the works include:

  • Extension of the existing main dike by 75 ml.
  • Construction of a 142 ml ear rooted on the secondary dike.
  • Dredging of the harbor basin.

The main quantities

  • Laying of riprap: 3,000 m3
  • Rock fill 0.5 to 1 ton: 6,900 m3
  • Rock fillings 1 to 2 tonnes: 1,300 m3
  • 2 to 4 tons riprap: 4,900 m3
  • Anything coming from 1 to 500 kg: 17,200 m3
  • Concrete for acropods: 2,850 m3
  • Basin dredging: 20,000 m3