Redevelopment of specialized posts at the Port of Rades

Redevelopment of specialized posts at the Port of Rades

Project

Redevelopment of specialized posts at the Port of Rades
Construction of the CH.911 multi-bulk dock

  • Contract amount: 16 517 549,401 TND
  • Work execution time: 12 months
  • Client: Office of the Merchant Navy and Ports

Consistency of the work

Construction of a quay on beaten metal piles type HZ, crowned by prefabricated reinforced concrete beams and a solid slab, it represents a docking length of 200 ml, the quay connects to the solid earth which has a land area of ​​37,000 m2.

The wharf construction works include:

  • the mud cleaning at - 12.00 hydro
  • excavation at - 12.00 hydro
  • demolition of old buildings and port infrastructure
  • driving metal piles
  • sheet pile wall
  • realization of the full earth
  • anti-corrosion painting of piles and sheet piles
  • roads and various networks linked to solid ground
  • lighting of open areas (4 poles of 21 m)
  • wharf gear (80 t steel bollards, fenders, ladder)
  • cathodic protection in soluble anodes

The main quantities

  • Demolition of the albacore dukes (-1.50 to -12.00 hydro): 2,016 m3
  • Metal piles in HZ profiles: 2,400 tonnes
  • Sheet piles: 140 tons
  • Concrete: 5,500 m3
  • Concrete steels: 1,000,000 kg
  • Bottom cleaning: 18,000 m3
  • Excavation of the bottom of the quay: 22,000 m3
  • 0.1 to 0.5 ton rip-rap: 87,000 tons
  • Landfill or landfill: 16,500 m3
  • Borrow materials: 40,500 m3
  • Anti-corrosion paint: 5,000 m2