Water transfer structures for Kebir and Moula Dams

Water transfer structures for Kebir and Moula Dams

Water transfer works from the Kebir and Moula dams CH.436

  • Contract amount: 6,267,101,248 TND
  • Work execution time: 42 months
  • Client: Ministry of Agriculture and Water Resources

Consistency of the work

Transport, cladding, pipe laying and special pieces of hooped concrete pipes and sheet metal core of Ø 1000, 1250, 1400, 1600 mm, as well as the construction works of civil engineering works necessary for the transfer of water, and which mainly consist of from: 

Sectioning structures
Drainage works
Protection works (high point)
Crossings of roads, tracks and railways
Air crossings
Siphon crossings
Irrigation pipe crossings

The main quantities


Pipe Ø 1600 mm: 10 200 ml
Pipe Ø 1400 mm: 15 800 ml
Pipe Ø 1250 mm: 3 100 ml
Pipe Ø 1000 mm: 2000 ml
Excavation: 298,600 m3
Embankments: 142,300 m3
Concrete: 9,650 m3
Steels: 173,000 kg