Water transfer works from the Kebir and Moula dams CH.436
- Contract amount: 6,267,101,248 TND
- Work execution time: 42 months
- Client: Ministry of Agriculture and Water Resources
Consistency of the work
Transport, cladding, pipe laying and special pieces of hooped concrete pipes and sheet metal core of Ø 1000, 1250, 1400, 1600 mm, as well as the construction works of civil engineering works necessary for the transfer of water, and which mainly consist of from:
Sectioning structures
Drainage works
Protection works (high point)
Crossings of roads, tracks and railways
Air crossings
Siphon crossings
Irrigation pipe crossings
The main quantities
Pipe Ø 1600 mm: 10 200 ml
Pipe Ø 1400 mm: 15 800 ml
Pipe Ø 1250 mm: 3 100 ml
Pipe Ø 1000 mm: 2000 ml
Excavation: 298,600 m3
Embankments: 142,300 m3
Concrete: 9,650 m3
Steels: 173,000 kg